Client |
Project/Subject |
Scope of
Services |
Period |
|
PETROCHEMICAL Research &
Development Co. |
HYDRAZIN
HYDRATE |
EPC |
May 2008-Oct 2008 |
|
PETROCHEMICAL Research &
Development Co. |
HYDROGEN
PEROXIDE |
EPC |
May 2008-Oct 2008 |
|
PETROCHEMICAL Research &
Development Co. |
FREON |
EPC |
May 2008-May 2009 |
|
BOALI PETROCHEMICAL CO. |
DECOKING SYSTEM |
BASIC & DETAIL DESIGN |
Feb2008-April
2008 |
|
PETROCHEMICAL Research &
Development Co. |
UTILITY/OFFSITE |
Basic Engineering |
Feb 2008-Jun 2008 |
|
MOBIN PETROCHEMICAL
CO. |
EXTENTION PROJECTS |
SITTING ANALYSIS AND
PLANT ASSEMENT,ENGINEERING /INSPECTION |
JAN 2008-JUL2009 |
|
BANDAR IMAM
PETROCHEMICAL CO. |
OLEFIN
PLANT REVAMPING |
MC & SUPERVISION |
March 2008-March 2009 |
|
RANGIN KAMAN CO. |
CHEMICAL
PLANT DESIGN |
BASIC AND DETAIL DESIGN
AND PROCURMENT SERVICES |
March 2008- Nov 2008 |
|
IRANOL CO. |
15-OIL
STORAGE TANKS AND RELATED ACCESSORIES |
BASIC AND DETAIL DESIGN |
DEC 2007-FEB-2008 |
|
GRAET TEHRAN GAS
CO. (GTGC) |
DOMESTIC GAS SUPPLY AND
DISTRIBUTION |
ENGINEERING AND SUPERVISION
|
SEP 2006-SEP 2009 (INPROGRESS) |
|
TEHRAN PROVINCE GAS
CO. (TPGC) |
DOMESTIC GAS SUPPLY AND
DISTRIBUTION |
BASIC & DETAIL DESIGN |
SEP 2006-MAY 2007 (INPROGRESS) |
|
ARAK GAS CO. (AGC) |
DOMESTIC GAS SUPPLY AND
DISTRIBUTION |
SITE SUPERVISION |
SEP 2006-SEP 2007 (INPROGRESS) |
|
KERMAN GAS CO.(KGC) |
CONSTRUCTION OF GAS
PIPE LINE 20 (INCH_ GOLGOHAR |
BASIC & DETAIL DESIGN & SITE SUPERVISION
|
DEC 2006-DEC 2008 (INPROGRESS) |
|
KERMAN GAS CO.(KGC) |
DOMESTIC GAS SUPPLY
AND DISTRIBUTION |
ENGINEERING AND SUPERVISION
|
DEC 2006-DEC 2007 (INPROGRESS) |
|
BANDAR IMAM
PETROCHEMICAL CO. |
STYRENE MONOMER STORAGE
TANKS,LOADING
AND UNLOADING |
BASIC & DETAILS, DESIGN
|
2005
(Completed) |
|
RAZI PETROCHEMICAL
CO. |
AMAK GAS TREATMENT |
BASIC & DETAILS, DESIGN
|
2005
(Completed) |
|
BANDAR IMAM
PETROCHEMICAL CO. |
ETHAN/PROPANE RECOVERY
PLANT |
MANAGING CONSULTANT/
SITE SUPERVISION
|
2002-2007
(Completed) |
|
BANDAR IMAM
PETROCHEMICAL CO. |
CAPACITY EXPANSION OF
OLEFIN PLANT |
MANAGING CONSULTANT |
2002-2006 |
|
GOLPAYGAN PETROCHEMICAL
CO. |
OFFSITE & UTILITIES"ABS/SAN" |
BASIC AND DETAIL
DESIGN / SITE SUPERVISION/
BID EVALUATION |
2002-2003
(Completed) |
|
TABRIZ PETROCHEMICAL
CO. |
LINE (E) OFFSITE
FACILITIES |
BASIC AND DETAIL DESIGN/
SITE SUPERVISION |
1999-2001
(Completed) |
|
RAZI PETROCHEMICAL
CO. |
NEW AMMONIA NO. 3 PLANT |
TECHNICAL-ECONOMICAL/
FEASIBILITY STUDY |
2000
(Completed) |
|
RAZI PETROCHEMICAL
CO. |
REHABILITATION OF
PHOSPHORIC ACID PLANT |
SITE SURVEY AND SITING
ANALYSIS/AS BUILT DOCUMENTATION/DEMAND
ANALYSIS/RECOMMENDATION |
2001-2002
(Completed) |
|
RAZI PETROCHEMICAL
CO. |
REHABILITATION/REVAMPING
OF UREA NO. 2 PLANT
(PHASE 1) |
-SITE SURVEY AND SITING
ANALYSIS-TENDER DOCUMENT PREPARATION-BID
EVALUATION-CONTRACT NEGOTIATION-CONTRACT
RECOMMENDATION-SELECTING CONTRACTOR |
2000-2002 (Completed) |
|
RAZI PETROCHEMICAL
COMPANY |
REHABILITATION/REVAMPING
OF UREA NO. 2 PLANT
(PHASE 2) |
MANAGING CONSULTANT/
SITE SUPERVISION |
2003-2006
(Completed) |
|
RAZI PETROCHEMICAL
COMPANY |
MAHSHAHR INDUSTRIAL ZONE |
SITING SURVEY AND SITING
ANALYSIS/AS BUILT DOCUMENTATION |
2001
(Completed) |
|
KISH WATER & POWER CO. |
RENOVATION AND
DEVELOPMENT OF WATER DISTRIBUTION SYSTEM |
BASIC AND DETAIL DESIGN |
1999-2000
(Completed) |
|
GUILAN WATER &
WASTEWATER CO. |
WATER
DISTRIBUTION SYSTEM |
UN ACCOUNTED FOR WATER(UFW)
STUDYTO REDUCE WATER LOSS |
1999
(Completed) |
|
MASHALDARAN
PETROCHEMICAL COMPANY |
L.A.B. PLANT |
SITING ANALYSIS AND
SITE SELECTION |
1998
(Completed) |
|
SHIRAZ PETROCHEMICAL
COMPANY |
RENOVATION/REVAMPING OF
CHLORINE ALKALINE PLANT |
SITE SURVEY & SITING
ANALYSIS/AS BUILT DOCUMENTATION AND DETAIL DESIGN |
1997
(Completed) |
|
KISH WATER AND POWER CO. |
UNACCOUNTED-FOR WATER "UFW"
STUDIES |
ENGINEERING SERVICES TO
REDUCE WATER LOSS |
1996-1997
(Completed) |
|
SEMNAN WATER AND
WASTEWATER CO. |
WATER DISTRIBATION |
PREPARATION OF OPERATION
AND MAINTENANCE MANUAL |
1996
(Completed) |
|
BUSHER WATER AND
WASTEWATER COMPANY |
UNACCOUNTED-FOR WATER "UFW"
STUDIES |
ENGINEERING SERVICES TO
REDUCE WATER LOSS |
1995-1998
(Completed) |
|
GARMSAR WATER SUPPLY CO. |
PIPE LINE CLEANING
DESIGN FROM ALOAK TO GARMSAR (77 KM) |
DESIGN CALCULATION AND
PREPARING PROCEDURE FOR MECHANICAL AND CHEMICAL
CLEANING |
1994
(Completed) |
|
GAJERE TECHNICAL COLLEGE |
SEWAGE TREATMENT PLANT |
BASIC AND DETAIL DESIGN
OF THE SYSTEM |
1992
(Completed) |